The adapter plates for the bottom have been fabbed and installed.
The clutch cable hole on the triple tree is filled in. It's also smoothed and polished. The triple tree and horn bracket are off to powder coat tomorrow.
I need to do the following things to complete this stage of my build.
- Fabricate mounts for the indicator lights.
- Wet Sand and Paint the fairing headlight sides.